Mathematical proof
The Los Angeles Desalination Proposal makes references to documents that support the mathematical claims made. The documents below detail the engineering calculations that prove the energy savings and cost of conveyance.
2001 SWP Conveyance Energy Requirements | |
File Size: | 171 kb |
File Type: |
2018 Membrane Bank Calculations, 1 BGD | |
File Size: | 195 kb |
File Type: |
2018 LA Desalination Head Loss Analysis | |
File Size: | 152 kb |
File Type: |
2018 LA Desalination Hoop Stress Analysis | |
File Size: | 152 kb |
File Type: |
2018 LA Desalination Energy Balance 720 MGD | |
File Size: | 155 kb |
File Type: |
2018 LA Desalination Energy Balance 1 BGD | |
File Size: | 155 kb |
File Type: |
2020 LA Desalination Energy Balance 2 BGD | |
File Size: | 535 kb |
File Type: |
2015 CRA Conveyance Energy Requirements | |
File Size: | 77 kb |
File Type: |
2015 LAA Hydropower Electricity Production | |
File Size: | 78 kb |
File Type: |